top of page

Industrial

  • Waste transfer facility, Bishopbriggs. £2 million. Client: Local authority / Viridor Waste Management. Novated architect for construction stage. 07/2019 – 10/2020.

  • Energy recovery facility, Dunbar. £175 million. Area 16 000 sqm. Client: Viridor Waste Management;Role: consultant in architecture. Stage: contractor design packages. (Smith Architecture/Fairhurst)03/2015 – 06/2016.

  • Miner bathhouse, Rudna: £370,000. Area 1440 sqm. Upgrade to current health and safety standards. Client: KGHM Polska Miedz SA. Role: architect. 07/2013

  • Ore mine facilities, Rudna: £520,000. Area 6400 sqm. Fire risk assessment for relaxation of the regulations and conversion. Staff access and circulation control schemes. Client: KGHM Polska Miedz SA. Extensions of time. Role: architect. 12/2012

  • Mine rescuer bathhouse, Rudna: £200,000. Area 220 sqm. Change of use and refurbishment of mine facilities comprising new rescuer quarters, baths and training centre. Client: KGHM Polska Miedz SA.Role: architect. 06/2011

  • Mine engine garage, Rudna: £130,000. Area 120 sqm. Client: KGHM Polska Miedz SA.
    Role: architect. 05/2012

  • Petrol stations, Tczew, Pozrzadlo, Zblewo and two locations in Gdynia: Cost over £700,000 each. Area 80 to 200 sqm. New built and replacement. Environmental assessments for locations in conservation area and in water intake protected area. Clients: Shell, PKN Orlen. Role: architect. 01/2010 – 12/2012

bottom of page